首页 | 本学科首页   官方微博 | 高级检索  
     检索      

35kV城网中性点经消弧线圈并联电阻接地方式下弧光接地过电压研究
引用本文:乔占俊.35kV城网中性点经消弧线圈并联电阻接地方式下弧光接地过电压研究[J].华北科技学院学报,2014(5):47-52.
作者姓名:乔占俊
作者单位:华北科技学院机电工程学院,北京东燕郊101601
基金项目:中央高校基本科研业务费资助(3142013065)
摘    要:选取过补偿脱谐度相对较小的消弧线圈以补偿电容电流,减小弧道残流、降低电弧重燃次数、提高故障自恢复概率;选取阻值相对较低的并联电阻以快速泄放对地电容的零序电荷,提高健全相、故障相及中性点的过电压衰减速度,减小熄弧后中性点恢复电压的上升速度和幅值,以有效抑制弧光接地引起的暂态过电压。ATP仿真结果表明,中性点经消弧线圈并联电阻接地方式是适用于电缆与架空导线混合的35kV城市配电系统较为理想的接地方式。

关 键 词:配电网  中性点  消弧线圈  并联电阻  弧光接地过电压  ATP仿真

Analysis and Simulation on Intermittent Arc Grounding Overvoltage for Neutral Grounding via Arc-suppression Coil with Shunt Resistance in 35kV Urban Distribution Systems
QIAO Zhan-jun.Analysis and Simulation on Intermittent Arc Grounding Overvoltage for Neutral Grounding via Arc-suppression Coil with Shunt Resistance in 35kV Urban Distribution Systems[J].Journal of North China Institute of Science and Technology,2014(5):47-52.
Authors:QIAO Zhan-jun
Institution:QIAO Zhan-jun (Department of Mechanical and Electronic Engineering, North China Institute of Science and Technology, Yanjiao, 101601, China)
Abstract:Some arc -suppression coil which has a relatively small overcompensation tuning -off degree is mainly used to compensate the capacitive current of line to ground , reduce the arc residual current and reigni-tion times, and then to increase the self -restoration probability after single phase intermittent arc grounding fault occurs.At the same time , a relatively small shunt resistance is mainly used to release the charge of line-to-ground capacitance quickly , improve the decay rate of fault and non -fault phase , s and neutral point , s overvoltage , reduce the rising speed of neutral point , s recovery voltage and its amplitude after the intermittent arc put out , so that the transient overvoltage can be restrained effectively.Results of ATP simulation have demonstrated the mode of neutral grounding via arc -suppression coil with shunt resistance is optimum choice which is applicable to 35 kV urban distribution networks mixed by overhead lines and cables.
Keywords:distribution system  neutral grounding  arc -suppression coil  shunt resistance  overvoltage  ATP simulation
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号