首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于改进MSD法的软土深基坑支护侧移规律
引用本文:苏秀婷,陈健,高文龙,乔阿龙,杜昌言.基于改进MSD法的软土深基坑支护侧移规律[J].科学技术与工程,2021,21(5):2002-2010.
作者姓名:苏秀婷  陈健  高文龙  乔阿龙  杜昌言
作者单位:上海勘察设计研究院(集团)有限公司青岛分公司,青岛266000;中国海洋大学环境科学与工程学院,青岛266100;中国海洋大学环境科学与工程学院,青岛266100;中铁十四局集团有限公司,济南250101;上海勘察设计研究院(集团)有限公司青岛分公司,青岛266000;青岛城阳方正市政工程有限公司,青岛266000;中铁十四局集团大盾构工程有限公司,南京211800
基金项目:国家自然科学基金项目(面上项目,重点项目,重大项目)
摘    要:软土地层中建造大型深基坑工程时往往面临着较大的风险和挑战,支护结构易发生变形且难以预测.对已有的可动强度设计(mobilizable strength design,MSD)理论进行总结,引入围护结构的弯曲应变能和内支撑的压缩弹性势能,完善基坑变形过程中的能量守恒体系,改进MSD法计算公式,并以济南黄河隧道北岸盾构工作井基坑工程为依托,对软土地层深基坑连续墙的变形进行预测,同时利用有限元分析法进行预测,并将预测结果与现场监测数据进行详细的分析比对,论证改进MSD法+有限元分析法预测体系的可靠性,分析误差来源,提出降低误差的措施,供类似工程参考.

关 键 词:改进MSD法  粉质黏土  有限元分析  深基坑  连续墙  变形预测
收稿时间:2020/5/15 0:00:00
修稿时间:2021/2/4 0:00:00

Analysis of Lateral Displacement Law of Deep Foundation Pit Support in Soft Soil Based on Improved MSD Method
Su Xiuting,Chen Jian,Gao Wenlong,Qiao Along,Du Changyan.Analysis of Lateral Displacement Law of Deep Foundation Pit Support in Soft Soil Based on Improved MSD Method[J].Science Technology and Engineering,2021,21(5):2002-2010.
Authors:Su Xiuting  Chen Jian  Gao Wenlong  Qiao Along  Du Changyan
Institution:SGIDI Engineering Consulting Group Co,Ltd Qingdao Branch;College of Environmental Science and Engineering,Ocean University of China;Qingdao Chengyang Fangzheng Municipal Engineering Co,Ltd; China Railway th Bureau Group Shield Engineering Co,Ltd
Abstract:The construction of large-scale deep foundation pit in soft soil is often faced with great risks and challenges. The supporting structure is easy to be deformed which is difficult to be predicted. This paper summarized the existing MSD theory, and introduced the bending strain energy of the retaining structure and the compression elastic potential energy of the internal support, also improved the energy conservation system in the process of foundation pit deformation, improved the MSD method calculation formula. Meantime, this paper predicted the deformation of the continuous wall of the deep foundation pit in soft soil layer based on the north bank shield shaft foundation pit project of Jinan Yellow River tunnel, and applied the finite element analysis method for prediction, and compared the prediction results with the field monitoring data in detail. This paper demonstrated the reliability of the improved MSD + FEA prediction system, and analyzed the error sources, and put forward the measures to reduce the error for the reference of similar projects.
Keywords:Improvement MSD method  silty clay  finite element analysis  deep foundation pit  continuous wall  deformation prediction
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号