深基坑支护预应力锚杆施工
引用本文:武正榜.深基坑支护预应力锚杆施工[J].太原理工大学学报,1998,29(6):629-631,635.
作者姓名:武正榜
作者单位:太原理工大学建设监理公司
摘    要:结合山西国际贸易中心工程,深基坑开挖采用支护桩加预应力锚杆工艺并编制了施工方案,根据锚杆确认的试验结果,叙述了各道工序的施工方法和质量要求,以及在施工过程中的关键控制点。

关 键 词:预应力锚杆  施工  深基坑  开挖  支护

Construction of Supporting Side Slope of Deep Excavation for Foundation with Prestress Anchors
Wu,Zhengbang.Construction of Supporting Side Slope of Deep Excavation for Foundation with Prestress Anchors[J].Journal of Taiyuan University of Technology,1998,29(6):629-631,635.
Authors:Wu  Zhengbang
Institution:Construction Supervision Co.
Abstract:Combined with the deep excavation for foundation of Shanxi International Trade Centre project, adopts support pile and prestress anchors,and compiles construction method.According to the result of experimental anchor,states every construction technology,quality control,and very important points in course of construction.
Keywords:prestress  anchor  construction  control  