首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于优先规则筛选的装配序列规划方法
引用本文:于嘉鹏,王成恩,张闻雷,于宏.基于优先规则筛选的装配序列规划方法[J].东北大学学报(自然科学版),2009,30(11):1636-1640.
作者姓名:于嘉鹏  王成恩  张闻雷  于宏
作者单位:1. 东北大学,机械工程与自动化学院,辽宁,沈阳,110004;东北大学,流程工业综合自动化教育部重点实验室,辽宁,沈阳,110004
2. 东北大学,流程工业综合自动化教育部重点实验室,辽宁,沈阳,110004
3. 东北大学,机械工程与自动化学院,辽宁,沈阳,110004
基金项目:解放军总装备部武器装备预研基金 
摘    要:针对现有装配序列规划方法在多目标优化求解准确性和效率等方面存在的不足,提出了新的装配模型及序列优化算法.首先构造了结构紧凑、包含更多装配关系信息的接触-连接矩阵,以及能有效解决非正交方向装配问题的扩展干涉矩阵,研究了通过干涉检测自动提取矩阵信息的方法.从自动化和量化角度研究了影响装配效率的若干规则,提供定制各规则及其优先顺序的柔性.提出了根据以上信息逐级筛选最优解,以构造最优序列的优化算法.最后以UG为平台开发了原型系统,以阀门为例,验证了本方法的可行性、高效性及其良好的可视化仿真效果.

关 键 词:装配序列规划  优化算法  优先规则  筛选  接触-连接矩阵  扩展干涉矩阵  

Assembly Sequence Planning Based on Screening of Priority Rules
YU Jia-peng,WANG Cheng-en,ZHANG Wen-lei,YU Hong.Assembly Sequence Planning Based on Screening of Priority Rules[J].Journal of Northeastern University(Natural Science),2009,30(11):1636-1640.
Authors:YU Jia-peng  WANG Cheng-en  ZHANG Wen-lei  YU Hong
Institution:(1) School of Mechanical Engineering and Automation, Northeastern University, Shenyang 110004, China; (2) Key Laboratory of Integrated Automation of Process Industry, Ministry of Education, Northeastern University, Shenyang 110004, China
Abstract:Aiming at the deficiency and inaccuracy in multi-objective optimization for assembly sequence planning, a novel assembly model and optimization algorithm is proposed. A more compact contact-connection matrix is constructed to provide more information in relation to assembly, and an extended interference matrix is given to solve the assembly problems in non-orthogonal direction to which other existing methods are unable. The methods for automatically acquiring the matricies are also studied. Several rules that affect assembly efficiency are studied from the viewpoints of automatic planning and quantification, with the flexibility provided for customizing them and their priorities. Then, an optimization algorithm is proposed via screening out the information as above stepwise so as to form a wholly optimized sequence. A prototype system is developed on UG platform with a valve taken as example to verify the feasibility and effectiveness of the method proposed, as well as its good visualized simulation effect.
Keywords:assembly sequence planning  optimization algorithm  priority rules  screening  contact-connection matrix  extended interference matrix
本文献已被 万方数据 等数据库收录!
点击此处可从《东北大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《东北大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号