浅谈改建既有线封锁施工准备
引用本文:赵泽孝. 浅谈改建既有线封锁施工准备[J]. 科学之友, 2011, 0(7)
作者姓名:赵泽孝
作者单位:中铁六局集团太原铁路建设有限公司;
摘    要:改建既有线封锁施工时间短、劳动强度大、标准要求高、卡控部位多,对外需要同甲方、设计、监理各个单位的相互协调,对内需要各个专业的配合才能完成。只有把施工准备工作做好才能保证施工封锁的顺利开工,圆满完工。

关 键 词:既有线  封锁  施工准备  

Discussion on the Construction Preparation of Conversing the Existing Line Block
Zhao Zexiao. Discussion on the Construction Preparation of Conversing the Existing Line Block[J]. Friend of Science Amateurs, 2011, 0(7)
Authors:Zhao Zexiao
Affiliation:Zhao Zexiao
Abstract:Conversing the existing line block has the characteristics involving short construction time,intensive labor,high standards,more control parts.To the external,it is necessary to make co-ordination with various units including the party,design,supervision units.To the internal,it is necessary to complete with the professional support.Only do the construction preparation work well,the smooth construction and successful completion of the construction blockade can be ensured.
Keywords:existing line  blockade  construction preparation  