首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅谈影响施工进度的客观因素
引用本文:王建.浅谈影响施工进度的客观因素[J].科技情报开发与经济,2008,18(35):218-219.
作者姓名:王建
作者单位:太原市建设工程交易中心,山西太原,030009
摘    要:阐述了加强施工进度管理的必要性,从施工的角度分析了影响工程进度的客观因素,指出企业应重点考虑影响施工进度的内部因素,从劳动者素质、技术装备、施工条件、劳动纪律等方面入手,提高生产效率。

关 键 词:施工进度  影响因素  客观因素  内部因素

Talking about Some Objective Factors Influencing the Construction Schedule
WANG Jian.Talking about Some Objective Factors Influencing the Construction Schedule[J].Sci-Tech Information Development & Economy,2008,18(35):218-219.
Authors:WANG Jian
Abstract:This paper expounds the necessity of strengthening the management of the construction schedule,and from the angle of the construction,analyzes some objective factors influencing the construction schedule,and points out that the enterprise should pay major attention to the internal factors influencing the construction schedule and increase the production efficiency starting from the aspects of labors' quality,technical equipment,construction conditions,and labor discipline,etc.
Keywords:construction schedule  influencing factor  objective factor  internal factor
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号