论施工支洞塌方段处理措施——以江苏溧阳抽水蓄能电站为例
引用本文:高若武,翟光宇.论施工支洞塌方段处理措施——以江苏溧阳抽水蓄能电站为例[J].山西科技,2010,25(3):77-78.
作者姓名:高若武  翟光宇
作者单位:1. 山西省汾河二库管理局,山西太原,030012
2. 河南省山河建设工程管理有限责任公司,河南郑州,450008
摘    要:文章主要对江苏溧阳抽水蓄能电站8#施工支洞0+525.5 m-0+528.5 m段塌方处理措施进行综述,可推广到其他相关隧洞塌方处理,并提供技术参考。

关 键 词:隧洞  塌方  措施

Measures to Treat Collapse in Construction Branch,with Liyang Pumped Storage Power Station in Jiangshu as an Example
GAO Ruowu,ZHAI Guangyu.Measures to Treat Collapse in Construction Branch,with Liyang Pumped Storage Power Station in Jiangshu as an Example[J].Shanxi Science and Technology,2010,25(3):77-78.
Authors:GAO Ruowu  ZHAI Guangyu
Institution:GAO Ruowu,ZHAI Guangyu
Abstract:The paper focuses on the treatment of the collapse in the 0+525.5m—0+528.5m section of the No.eight construction branch of Liyang Pumped Storage Power Station in Jiangshu,which may be of referential significance for the construction of the same kind.
Keywords:tunnel  collapse  measure