首页 | 本学科首页   官方微博 | 高级检索  
     检索      

兰郑长成品油管道穿越兰新线K11+563m处桥台基础验算
引用本文:宁波,李科兴,于本田.兰郑长成品油管道穿越兰新线K11+563m处桥台基础验算[J].新余高专学报,2010,15(5):79-81.
作者姓名:宁波  李科兴  于本田
作者单位:[1]陕西铁路工程职业技术学院,陕西渭南714000 [2]兰州交通大学,甘肃兰州730070
摘    要:根据工程需要对原有桥梁基础进行检算,采用有限元(ANSYS)数值方法模拟石油管线开挖对桥台基础的影响,根据计算结果得出相关结论。

关 键 词:桥梁基础  管线开挖  受力分析

Check of the foundation of abutment at K11+563m of Lanxin Line crossed by Lanzheng product oil pipeline
NING Bo,LI Ke-xing,YU Ben-tian.Check of the foundation of abutment at K11+563m of Lanxin Line crossed by Lanzheng product oil pipeline[J].Journal of XinYu College,2010,15(5):79-81.
Authors:NING Bo  LI Ke-xing  YU Ben-tian
Institution:1.Shanxi Vocational Institute of Railway Engineering Technology, Weinan 714000 China;2.Lanzhou Jiaotong University, Lanzhou 730070 China)
Abstract:According to the need,check of the original foundation of bridge was made.ANSYS was adopted to simulate the influence of excavation of oil pipeline on the abutment foundation.Based on the calculation result and according to the requirements for the concrete,this paper gave the conclusion.
Keywords:foundation of bridge  excavation of pipeline  analysis of stress
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号