首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅谈山西省柏叶口水库工程初设阶段测量工作
引用本文:朱小萍.浅谈山西省柏叶口水库工程初设阶段测量工作[J].科技情报开发与经济,2010,20(31):200-201.
作者姓名:朱小萍
作者单位:山西省水利水电勘测设计研究院,山西太原030024
摘    要:介绍了在山西省柏叶口水库工程初设阶段测量工作中如何设计测量方案,以及如何达到高精度的要求。

关 键 词:测量方案  统计精度  柏叶口水库

Talking about the Surveying Work in the Preliminary Design Stage of Baiyekou Reservoir Project in Shanxi Province
ZHU Xiao-ping.Talking about the Surveying Work in the Preliminary Design Stage of Baiyekou Reservoir Project in Shanxi Province[J].Sci-Tech Information Development & Economy,2010,20(31):200-201.
Authors:ZHU Xiao-ping
Institution:ZHU Xiao-ping
Abstract:This paper introduces how to design the surveying scheme in the surveying work in the preliminary design stage of Baiyekou Reservoir project in Shanxi Province and how to meet the requirement of high precision.
Keywords:surveying scheme  statistical precision  Baiyekou Reservoir
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号