首页 | 本学科首页   官方微博 | 高级检索  
     

赵坎子枢纽互通式立交设计方案比选
引用本文:张振. 赵坎子枢纽互通式立交设计方案比选[J]. 科技资讯, 2014, 0(9): 62-64
作者姓名:张振
作者单位:辽宁省交通规划设计院,辽宁沈阳110166
摘    要:鲅鱼圈疏港高速赵坎子立交方案选取受制约因素很多,通过对各个制约因素的研究,提出了三个设计方案,从多个角度对这三个方案进行了比较,提出了推荐方案,以期对类似工程有所帮助。

关 键 词:互通立交  制约因素  设计方案  方案比选

Design Scheme Selection of Zhaokanzi Pivotal Interchange
Zhang Zhen. Design Scheme Selection of Zhaokanzi Pivotal Interchange[J]. Science & Technology Information, 2014, 0(9): 62-64
Authors:Zhang Zhen
Affiliation:Zhang Zhen (Liaohing Provincial Communication Planning design & I nstitute,Shenyang Liaoning,110166 China)
Abstract:Design scheme of ZhaoKanZi pivotal interchange on BaYuQuan ShuGang Highway are restricted by various factors, through the study of all restraining factors,three design scheme are proposed and compared from multiple perspectives. Finally,the recommended scheme is put forward which can be referenced for similar projects.
Keywords:Interchange  Restraining Factors  Design Scheme  Scheme Selection
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号