首页 | 本学科首页   官方微博 | 高级检索  
     检索      

影响CFG桩施工的几个地质因素及处理办法
引用本文:王健,吴凯,张书建.影响CFG桩施工的几个地质因素及处理办法[J].华北科技学院学报,2009,6(1):26-29.
作者姓名:王健  吴凯  张书建
作者单位:河北中色华冠岩土工程有限公司,河北,三河,065201
摘    要:CFG桩施工质量受一定地质因素影响。本文浅谈了几点影响因素及预防处理办法,并通过工程实例说明了CFG桩施工质量受地下水影响时,如何使用其他桩型进行有效处理。

关 键 词:长螺旋钻孔泵压成桩  地质影响因素  预防处理办法

Discussed shallowly affects the CFG pile construction several geologic factors and the processing approaches
WANG Jian,WU Kai,ZHANG Shujian.Discussed shallowly affects the CFG pile construction several geologic factors and the processing approaches[J].Journal of North China Institute of Science and Technology,2009,6(1):26-29.
Authors:WANG Jian  WU Kai  ZHANG Shujian
Institution:HeBei Zhongse huaguan Geotechnical Engineering Co.;Ltd.;Hebei Sanhe 065201
Abstract:CFG pile construction quality certain geologic agent influence.This article discussed shallowly several influencing factors and the prevention measure,and showed through the project example when CFG pile construction quality ground water influence,how to use other piles to carry on effective processing.
Keywords:pump pressure bored pile  geological factors  prevention approach  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号