首页 | 本学科首页   官方微博 | 高级检索  
     

基坑支护结构的综合选型及受力与变形特性
引用本文:朱琦,李帅,魏东旭,王贯国,徐毅,郑国胜. 基坑支护结构的综合选型及受力与变形特性[J]. 科学技术与工程, 2020, 20(32): 13369-13378
作者姓名:朱琦  李帅  魏东旭  王贯国  徐毅  郑国胜
作者单位:山东省交通规划设计院有限公司, 济南250000;山东省交通规划设计院有限公司, 济南250000;山东省交通规划设计院有限公司, 济南250000;山东省交通规划设计院有限公司, 济南250000;山东省交通规划设计院有限公司, 济南250000;山东省交通规划设计院有限公司, 济南250000
摘    要:本文以京沪高速改扩建工程莱芜至临沂段一标段3#钢筋加工场深基坑工程为依托,采用多目标层次分析和模糊综合评判法选出适合本工程的支护形式。结合现场监测和数值模拟,分析了在本支护形式下,基坑施工过程中的土体和支护结构力学及变形特征,研究结果表明:(1)采用基于多目标AHP的模糊综合评判方法建立多指标评价体系,确定了基坑支护采用上部1:1放坡+土钉支护,下部咬合桩+钢筋混凝土内支撑的方案;(2)土体地表沉降随距基坑的距离呈先减小后增大的趋势,咬合桩能较好的控制边坡变形;(3)咬合桩桩身最大位移位置随开挖的进行逐渐下移,且两次竖直位移的增量比约为相邻土层厚度比。受自重影响,咬合桩桩身弯矩对称,每条边中点附近弯矩值偏大;(4)将现场监测结果有限元分析数据结果进行对比,验证了数值模拟和多指标评价体系的可靠性。

关 键 词:基坑工程  支护设计  层次分析法(AHP)  数值模拟  基坑监测
收稿时间:2019-08-16
修稿时间:2020-06-30

Comprehensive selection of foundation pit supporting structure and behavior of stress and deformation
Zhu Qi,Li Shuai,Wei Dong-xu,Wang Guan-guo,Xu Yi,Zheng Guo-sheng. Comprehensive selection of foundation pit supporting structure and behavior of stress and deformation[J]. Science Technology and Engineering, 2020, 20(32): 13369-13378
Authors:Zhu Qi  Li Shuai  Wei Dong-xu  Wang Guan-guo  Xu Yi  Zheng Guo-sheng
Affiliation:Shandong Provincial Transportation Planning and Design Institute,Shandong Provincial Transportation Planning and Design Institute,Shandong Provincial Transportation Planning and Design Institute,Shandong Provincial Transportation Planning and Design Institute,Shandong Provincial Transportation Planning and Design Institute,Shandong Provincial Transportation Planning and Design Institute
Abstract:Based on the deep foundation pit project of No. 3 section in 1st section of Laiwu to Linyi section in Beijing-Shanghai Expressway Reconstruction and Expansion Project, this paper used multi-objective level analysis and fuzzy comprehensive evaluation method to select the suitable support form for this project. Combined with on-site monitoring and numerical simulation, the mechanic and deformation characteristic of soil and supporting structure during the foundation pit construction of are analyzed under using supporting form. The research result show that the multi-objective fuzzy comprehensive evaluation method based on multi-objective AHP was used to establish a multi-index evaluation system, and upper 1: 1 slope + soil nail support method was determined. (2) The surface settlement decreased first and then increased with increase of distance from foundation pit. The bite pile can better control slope deformation well. (3) The maximum displacement position of bite pile body gradually moved down with the excavation, and the ratio of two vertical displacements is equal to the thickness ratio of adjacent soil layer. (4) Comparing the result of on-site monitoring result with finite element analysis data, the reliability of numerical simulation and multi-index evaluation system was verified.
Keywords:foundation pit engineering   support design   AHP   fuzzy analysis   numerical simulation   field monitoring
本文献已被 万方数据 等数据库收录!
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号