首页 | 本学科首页   官方微博 | 高级检索  
     

Application and Study on Dynamic Design in Qinghai-Tibet Railway Construction
引用本文:Ma Wei,Cheng Guodong,Wu Qingbai. Application and Study on Dynamic Design in Qinghai-Tibet Railway Construction[J]. 中国工程科学, 2006, 4(2): 77-84
作者姓名:Ma Wei  Cheng Guodong  Wu Qingbai
作者单位:State Key Laboratory of Frozen Soil Engineering, CAREERI, CAS, Lanzhou 730000
基金项目:The work is supported by the grant of the Knowledge Innovation Program of the Chinese Academy of Sciences(No. KZCX1-SW-04), and the National Key Basic Research and Development Foundation of the Ministry of Sciences and Technology of China(Grant No. 2002CB412704).
摘    要:0Preface Permafrostisasoilmediumwhichisextremely sensitivetotemperatureandsurroundingfactors.Themostessentialdistinctionbetweenpermafrost andotherrockorsoilisthatitcontainsground ice.Whileconstructinganystructureson permafrost,twomajorengineeringproblemsmustbesolved:freezingheaveinflationandthawing settlement.TheGolmud LhasaSectionofQinghai Tibet Railway,withatotallengthof1118km,hasa totaldistanceof632kmrunningonpermafrost,outofwhichabout550kmiscontinuous permafrost,82kmispatchypermafrost,9…

关 键 词:青藏铁路 动力设计 永久冻结带 铁路建设 信息建设
收稿时间:2006-04-07

Application and Study on Dynamic Design in Qinghai-Tibet Railway Construction
Ma Wei,Cheng Guodong and Wu Qingbai. Application and Study on Dynamic Design in Qinghai-Tibet Railway Construction[J]. Engineering Sciences, 2006, 4(2): 77-84
Authors:Ma Wei  Cheng Guodong  Wu Qingbai
Affiliation:(State Key Laboratory of Frozen Soil Engineering, CAREERI, CAS, Lanzhou 730000);(State Key Laboratory of Frozen Soil Engineering, CAREERI, CAS, Lanzhou 730001);(State Key Laboratory of Frozen Soil Engineering, CAREERI, CAS, Lanzhou 730002)
Abstract:The dynamic design method is essentially the evolving processes of various information, it consists of dynamic design and information construction. It is a new technology of increasing popularity. Because of the particularity and complexity of the Qinghai-Tibet Railway construction, the technology of the dynamic design and information constructing was used tentatively. Based on processes of Qinghai-Tibet Railway construction, this paper discussed and analysed the idea of dynamic design and applications. Meanwhile in allusion to arisen problems in design and construction, some principles and suggestions of reinforced measurements were put forward. Though the works of construction and design are being carried through, good results have been obtained.
Keywords:Qinghai-Tibet Railway   permafrost   dynamic design   information constructing
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《中国工程科学》浏览原始摘要信息
点击此处可从《中国工程科学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号