首页 | 本学科首页   官方微博 | 高级检索  
     

岩溶台地高压富水特长隧道勘察的精细化探索
引用本文:张鹏,李振兴,骆伟,马德青,潘晓东,邬远明. 岩溶台地高压富水特长隧道勘察的精细化探索[J]. 科学技术与工程, 2022, 22(16): 6408-6420
作者姓名:张鹏  李振兴  骆伟  马德青  潘晓东  邬远明
作者单位:湖南省交通规划勘察设计院有限公司;中国地质科学院岩溶地质研究所
摘    要:岩溶台地高压富水特长隧道精细化勘察应在收集和分析区域地质资料、前期勘察成果、前人研究成果及类似工程案例的基础上,找出主要的水文与工程地质问题,针对这些问题进行水文地质与工程地质调绘和地球物理探测,在此基础上构建地质模型,并采用有针对性的水文地质钻探、工程地质钻探、现场监测与测试及数值仿真等方法与手段,对地质模型进行验证、丰富与优化。以G59呼北高速张家界—官庄段沅古坪隧道为研究对象,为了查明岩溶台地高压富水特长隧道的水文地质与工程地质条件,在水文地质与工程地质测绘、地球物理探测、地质钻探及工程评价等方面进行了精细化勘察的探索与研究,提出了精细化勘察技术思路。根据精细化勘察技术思路,细分隧道区域的地下水系统,划为17个地下水系统,隧道穿越9个地下水系统。采用空气潜孔锤(down-the-hole, DTH)-孔内电视复合方法查清了大湖村段水文地质结构,在此基础上,采用解析法和数值法预测了隧道涌水量,隧道涌水量在150 mm降雨量条件下为26.93×104 m3/d,评价了突水突泥风险,在大湖村岩溶泉系统及柏杨坪岩溶地下河系统为高风险区。

关 键 词:精细化勘察  岩溶台地  高压富水  水文地质  空气潜孔锤(DTH)
收稿时间:2021-07-23
修稿时间:2022-02-24

Fine Survey of High Pressure and Rich Water Super Long Tunnel in Karst Platform
Zhang Peng,Li Zhenxing,Luo Wei,Ma Deqing,Pan Xiaodong,Wu Yuanming. Fine Survey of High Pressure and Rich Water Super Long Tunnel in Karst Platform[J]. Science Technology and Engineering, 2022, 22(16): 6408-6420
Authors:Zhang Peng  Li Zhenxing  Luo Wei  Ma Deqing  Pan Xiaodong  Wu Yuanming
Affiliation:Hunan Provincial Communications Planning,Survey Design Institute Co,LTD; Institute of Karst Geology,Chinese Academy of Geological Sciences,Guilin
Abstract:Based on the collection and analysis of regional geological data, preliminary investigation results, previous research results and similar engineering cases, the main hydrogeological and engineering geological problems should be found out in the fine survey of karst platform high-pressure water rich super long tunnel. Hydrogeological and engineering geological mapping and geophysical exploration should be carried out to solve these problems, and the geological model should be constructed on this basis. The methods of hydrogeological drilling, engineering geological drilling, field monitoring and testing and numerical simulation are used to verify, enrich and optimize the geological model. Taking Yuanguping tunnel of Zhangjiajie to Guanzhuang section of G59 Hubei expressway as the research object, in order to find out the hydrogeological and engineering geological conditions of high-pressure water rich super long tunnel in karst platform, this paper explores and studies the fine survey in the aspects of hydrogeological and engineering geological mapping, geophysical exploration, geological drilling and engineering evaluation, and puts forward the technical ideas of fine survey. According to the idea of fine survey technology, the groundwater system in the tunnel area is subdivided into 17 groundwater systems, and the tunnel passes through 9 groundwater systems. The hydrogeological structure of Dahu Village section is investigated by using the air DTH hammer borehole and TV composite method. On this basis, the tunnel water inflow is predicted by using analytical method and numerical method. The tunnel water inflow is 26.93×104 m3/d. The risk of water and mud inrush is evaluated. The karst spring system in Dahu village and the karst underground river system in Baiyangping are high risk areas.
Keywords:fine survey   Karst platform   high pressure and rich water   hydrogeology   air DTH hammer
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号