首页 | 本学科首页   官方微博 | 高级检索  
     

具有模糊交货期的平行机排序问题
引用本文:霍录景. 具有模糊交货期的平行机排序问题[J]. 科学技术与工程, 2012, 12(12): 2832-2834,2844
作者姓名:霍录景
作者单位:北京师范大学珠海分校应用数学学院,珠海,519087
摘    要:研究了一种具有模糊交货期的平行机调度问题,目标函数是最大模糊延误修正值,并对相关的模型给出了算法。为了计算方便,文章采用模糊交货期的隶属函数与任务的完工时间之间的关系,判断任务是否误工。

关 键 词:三角形模糊数   模糊交货期   最大模糊延误修正值
收稿时间:2012-02-15
修稿时间:2012-02-15

Parallel Machine Scheduling Problem with Fuzzy Due Dates
Huo Lujing. Parallel Machine Scheduling Problem with Fuzzy Due Dates[J]. Science Technology and Engineering, 2012, 12(12): 2832-2834,2844
Authors:Huo Lujing
Affiliation:(Department of Applied Mathematics,Beijing Normal University,Zhuhai 519087,P.R.China);
Abstract:In this paper, we study a kind of parallel machine scheduling problem with fuzzy due dates, where the aim function is the revised value of maximum fuzzy lateness. Then the algorithm for this problem is given. The relationship between the membership functions of fuzzy due dates and the completion time is employed to decide whether jobs are tardy.
Keywords:triangle numbers   fuzzy due dates   the revised value of maximum fuzzy lateness
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号