首页 | 本学科首页   官方微博 | 高级检索  
     检索      

水电站群装机容量分配的多目标模糊优化方法
引用本文:李会安,黄强,沈晋.水电站群装机容量分配的多目标模糊优化方法[J].西安理工大学学报,1998,14(3):289-293.
作者姓名:李会安  黄强  沈晋
作者单位:西安理工大学水利水电学院
摘    要:多目标模糊优化方法能够反映各个单目标最优解与多目标满意解之间的相互关系,能较好地同时考虑多种影响因素。本文针对水电站群装机容量分配的多目标性,利用模糊优化理论,探讨提出了水电站群装机容量分配的多目标模糊优化方法,并通过算例验证了方法的可行性。

关 键 词:水电站群,装机容量,模糊优化,多目标

Multi-objective Fuzzy Optimal Method for Installed Capacity Distribution of Hydroelectric Station Group
Li Huian,Huang Qiang,Shen Jin.Multi-objective Fuzzy Optimal Method for Installed Capacity Distribution of Hydroelectric Station Group[J].Journal of Xi'an University of Technology,1998,14(3):289-293.
Authors:Li Huian  Huang Qiang  Shen Jin
Abstract:This paper studies and analysis a power driven system with complex mechanical electrical connections, and suggests a control method for state feedback as well as load acceleration control based on state observer. The results show that this method is better for improving performances, enhancing robustness of the system.
Keywords:elasticity connection  torsional vibration
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号