首页 | 本学科首页   官方微博 | 高级检索  
     检索      

糯扎渡堆石坝施工期心墙沉降统计模型分析
引用本文:陈剑龙,王利启.糯扎渡堆石坝施工期心墙沉降统计模型分析[J].三峡大学学报(自然科学版),2012,34(2):19-24.
作者姓名:陈剑龙  王利启
作者单位:1. 河海大学水利水电学院,南京210098;水文水资源与水利工程科学国家重点实验室,南京210098
2. 华能澜沧江水电有限公司糯扎渡电厂筹备处,云南普洱,665005
基金项目:国家自然科学基金资助项目(51139001,51179066,51079046,50909041); 河海大学水文水资源与水利工程科学国家重点实验室专项基金(2009586912); 中央高校基本科研业务费项目(2009B08514,2010B20414,2010B01414,2010B14114); 江苏高校优势学科建设工程资助项目(水利工程)(YS11001); 水利部公益性行业科研专项经费项目(201201038)
摘    要:以糯扎渡施工期心墙沉降为研究对象,阐述了统计回归模型的建立与分析的理论及步骤.借鉴传统统计模型,通过改变模型因子形式建立不同模型,对比分析模型应用结果确定较优且适用的统计模型形式.通过实测资料建立模型并评价模型预测效果,结果表明模型预测精度高,使用较传统模型更为方便,可以作为该工程施工期沉降分析的一个工具,并可为类似工程提供参考.

关 键 词:糯扎渡水电站  心墙堆石坝  施工期  沉降  统计模型

Analysis of Statistical Model of Core-Wall Settlement During Construction for Nuozhadu Rockfill Dam
Chen Jianlong , Wang Liqi.Analysis of Statistical Model of Core-Wall Settlement During Construction for Nuozhadu Rockfill Dam[J].Journal of China Three Gorges University(Natural Sciences),2012,34(2):19-24.
Authors:Chen Jianlong  Wang Liqi
Institution:1.College of Water Conservancy & Hydropower Engineering,Hohai Univ.,Nanjing 210098,China; 2.State Key Laboratory of Hydrology-Water Resources & Hydraulic Engineering,Hohai Univ.,Nanjing 210098,China; 3.Nuozhadu Hydropower Plant Preparatory Office of Huaneng Lancang River Hydropower Co.,Ltd.,Puer 665005,China)
Abstract:This paper studies the core-wall settlement of Nuozhadu core-wall rockfill dam in the construction period and describes the establishment and analysis of the theory and procedures for statistical regression model.Based on traditional statistical model,different models are established by changing the forms of model factors;comparative analysis of the results of model application is made so as to determine the appropriate and better statistical model form.Through the measured data to establish the model and evaluate the prediction of different models.The results indicate that the accuracy of model prediction is high and it is more convenient than the traditional model.Therefore,it can be used as a tool for settlement analysis for Nuozhadu project in the construction period and providing a reference for similar projects.
Keywords:Nuozhadu hydropower plant  core-wall rockfill dam  construction period  settlement  statistical model
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号