Integrated Quay Crane and Yard Truck Schedule Problem in Container Terminals |
| |
Authors: | Jinxin Cao Qixin Shi Der-Horng Lee |
| |
Affiliation: | 1. Department of Civil Engineering, Tsinghua University, Beijing 100084, China;2. Department of Transportation Engineering, Inner Mongolia University, Hohhot 010070, China;3. Department of Civil Engineering, National University of Singapore, Singapore 117576, Singapore |
| |
Abstract: | Quay crane and yard truck scheduling are two important subproblems in container terminal operations which have been studied separately in previous research. This paper proposes a new problem for the integrated quay crane and yard truck scheduling for inbound containers. The problem is formulated as a mixed integer programming (MIP) model. Due to the intractability, a genetic algorithm (GA) and a modified Johnson's Rule-based heuristic algorithm (MJRHA) are used for the problem solution. In addition, two closed form lower bounds are given to evaluate the solution accuracy. Computational experiments show that the solution algorithm can efficiently handle the scheduling problem and that the integrated methods are very useful. |
| |
Keywords: | |
本文献已被 ScienceDirect 等数据库收录! |
|