贵池发电厂首期工程综合试桩
引用本文:王国强,李跃升.贵池发电厂首期工程综合试桩[J].合肥工业大学学报(自然科学版),1998(Z1).
作者姓名:王国强  李跃升
作者单位:合肥工业大学 (王国强),安徽省电力设计院(李跃升)
摘    要:贵池发电厂首期工程在试桩中,进行了多项目的综合性试验。通过试桩比选确定首期工程基础采用钢筋混凝土预制桩。从而满足了设计、施工、管理、检测所需要的各种参数,保证了工程地基处理的质量。

关 键 词:试桩  桩基承载力  静载荷试验  动力测试

THE SYNTHETIC PILE TESTING OF GUICHI POWER PLANT'S FIRST STAGE ENGINEERING
Wang Guoqiang Li Yuesheng.THE SYNTHETIC PILE TESTING OF GUICHI POWER PLANT'S FIRST STAGE ENGINEERING[J].Journal of Hefei University of Technology(Natural Science),1998(Z1).
Authors:Wang Guoqiang Li Yuesheng
Institution:Wang Guoqiang Li Yuesheng (Hefei University of Technology) (Anhui Electricity Designing Institute)
Abstract:During the pile testing of Guichi power plant's first stage engineering, various synthetical tests are engaged in. And the reinforced concrete prefabricate pile is selected to be used as the first stage engineering's foundation, which satisfies various parameters needed in design, construction, management, inspection, and assures the treatment quality of engineering foundation.
Keywords:pile testing  pile foundation's bearing capacity  static load test  dynamic test