首页 | 本学科首页   官方微博 | 高级检索  
     检索      

CO2埋存井注入过程中水泥环应力完整性研究
引用本文:李静.CO2埋存井注入过程中水泥环应力完整性研究[J].科学技术与工程,2013,13(8):2057-2061.
作者姓名:李静
作者单位:东北石油大学
基金项目:黑龙江省留学归国基金项目(LC2011C28)资助
摘    要:CO2埋存井固井水泥环完整性直接涉及到CO2能否安全、长期有效的进行地质埋存,因此对埋存井水泥环完整性的分析是很有必要的。提出了CO2埋存井水泥环动态应力完整性模型,并分析了温降、地层孔隙压力的变化对水泥环应力完整性的影响。结果表明:温降和孔隙压力的增大均能对水泥环产生轴向诱导拉应力,温降和孔隙压力单独作用时,不足以使水泥环受拉而发生破坏。两者同时作用时,当温降和孔隙压力增加到一定值就会使水泥环发生轴向断裂。产生水平裂纹,所以为了保证水泥环完整性不发生破坏,在注入CO2时,要正确的处理好CO2的注入温度与注入速度的关系。

关 键 词:埋存井  水泥环  温降  孔隙压力
收稿时间:2012/10/30 0:00:00
修稿时间:2012/10/30 0:00:00

Research on Cement Sheath Stress Integrity of CO2 Buried Well in the Process of Injection
lijing.Research on Cement Sheath Stress Integrity of CO2 Buried Well in the Process of Injection[J].Science Technology and Engineering,2013,13(8):2057-2061.
Authors:lijing
Institution:4(Northeast Petroleum University1,Daqing 163318,P.R.China;No.1 Oil Plant of Daqing Oilfield Company Ltd2,Daqing 163001,P.R.China;Qianan Oil Plant of Jilin Oilfield Company,Songyuan 131400,P.R.China; CO2 driven Project management department of Jilin Oilfield Company4,Songyuan 138000,P.R.China)
Abstract:Cement sheath stress integrity of CO2 buried well directly involves CO2 whether can be safety and long-term effective geological buried or not , therefore the analysis of buried wells cement sheath integrity is very necessary. CO2 buried well cement sheath stress integrity model is rasied, and analyses the effects temperature drop and formation pore pressure change on cement sheath stress integrity.The results show that temperature drop and the increase of pore pressure are able to produce axial induced tensile stress to cement sheath, when temperature drop and pore pressure act separately, it is not enough to make cement sheath damaged for tensile stress;While they both acted , as temperature drop and pore pressure increases to a certain value will make cement sheath produce axial fracture and horizontal crack is appeared, So in order to ensure the integrity of cement sheath , before the injection of CO2, it is important to deal with the relation between injection temperature and injection speed correctly.
Keywords:buried well  cement sheath  temperature drop  pore pressure
本文献已被 CNKI 等数据库收录!
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号