关于在已完成楼面上加设200t重水箱的结构处理分析
引用本文:李婷.关于在已完成楼面上加设200t重水箱的结构处理分析[J].科技情报开发与经济,2012,22(10):158-160.
作者姓名:李婷
作者单位:山西潞安工程勘察设计咨询有限责任公司,山西长治,046204
摘    要:为改变现有建筑物的部分使用功能而需要增加设备的情况屡见不鲜。若需增加的设备质量较大,不能直接放在楼面上,就需要对原有结构进行加固修改。讨论了在已完成楼面上加设200t重水箱的结构处理问题。

关 键 词:楼面  水箱  结构处理

Analysis on the Structural Treatment of the Completed Floor Adding a 200 t Water Tank
LI Ting.Analysis on the Structural Treatment of the Completed Floor Adding a 200 t Water Tank[J].Sci-Tech Information Development & Economy,2012,22(10):158-160.
Authors:LI Ting
Abstract:It is common that increasing devices on existing buildings in order to change these building’s partial functions of use.If the added devices can not be directly put on the floor because of their heavy weight,their original structures are needed to be reinforced and changed.This paper discusses the problem of the structural treatment of the completed floor adding a 200 t water tank.
Keywords:existing floor  water tank  structural treatment