冬奥会山区综合管廊1#支洞关键工程地质问题及地质选线
引用本文:杨良权,晋凤明,袁鸿鹄,孙宇臣,张如满,王魏东.冬奥会山区综合管廊1#支洞关键工程地质问题及地质选线[J].科学技术与工程,2022,22(33):14881-14890.
作者姓名:杨良权  晋凤明  袁鸿鹄  孙宇臣  张如满  王魏东
作者单位:北京市水利规划设计研究院
基金项目:国家重点工程(2022年冬奥会延庆赛区配套综合管廊工程);北京市水利规划设计研究院科研专项(SG2017199);北京市科研项目(XM-0000152102170227021)。
摘    要:冬奥会山区综合管廊1#支洞区域地质背景复杂,为了科学地指导1#支洞路由选址工作,通过地质测绘、钻探、工程物探、原位测试、水文试验、室内试验的综合勘察技术方法对综合管廊1#支洞的主要工程地质问题进行了深入研究与分析。研究表明,断层带破碎问题、突水涌水问题、围岩稳定问题为1#支洞突出的工程地质问题,并对其进行了定量评价。在此基础上,确定了综合管廊1#支洞地质选线原则,并结合BIM三维模型,对北线、南线方案进行了比选,确定了地质条件相对较优的南线方案。研究的方法可为存在类似工程地质条件或工程地质问题的山区地下工程的地质选线提供一定的参考与借鉴。

关 键 词:山区综合管廊  1#支洞  工程地质问题  地质选线  BIM  冬奥会
收稿时间:2022/3/17 0:00:00
修稿时间:2022/11/9 0:00:00

Study on Key Engineering Geological Problems and Geological Route Selection of No. 1 Branch Tunnel in Mountainous Area of Winter Olympic Games
Yang Liangquan,Jin Fengming,Yuan Honghu,Sun Yuchen,Zhang Ruman,Wang Weidong.Study on Key Engineering Geological Problems and Geological Route Selection of No. 1 Branch Tunnel in Mountainous Area of Winter Olympic Games[J].Science Technology and Engineering,2022,22(33):14881-14890.
Authors:Yang Liangquan  Jin Fengming  Yuan Honghu  Sun Yuchen  Zhang Ruman  Wang Weidong
Institution:Beijing institute of water
Abstract:The geological background of the No. 1 branch tunnel of the mountainous area integrated pipe gallery of the Winter Olympic Games is complex. In order to scientifically guide the routing and location selection of the No. 1 branch tunnel, the main engineering geological problems of the No. 1 branch tunnel of the integrated pipe gallery are studied and analyzed in depth through the comprehensive survey technology methods of geological mapping, drilling, engineering geophysical prospecting, in-situ test, hydrological test and indoor test. The research shows that the fracture of fault zone, water inrush and water gushing, and the stability of surrounding rock are the prominent engineering geological problems of No. 1 branch tunnel, and they are quantitatively evaluated. On this basis, the geological route selection principle of No. 1 branch tunnel of utility tunnel is determined. Combined with BIM three-dimensional model, the schemes of north line and south line are compared and selected, and the south line scheme with relatively better geological conditions is determined. The research method of this paper can provide some reference for the geological route selection of underground engineering in mountainous areas with similar engineering geological conditions or engineering geological problems.
Keywords:mountain integrated pipe gallery  No  1 branch tunnel  engineering geological problems  geological line selection  BIM  Winter Olympic Games  