首页 | 本学科首页   官方微博 | 高级检索  
     检索      

尾管固井过程中钻柱的动态摩阻力与变形研究
引用本文:练章华,郑建翔,张颖,石磊,牟凤英.尾管固井过程中钻柱的动态摩阻力与变形研究[J].西南石油大学学报(自然科学版),2016,38(4):149-156.
作者姓名:练章华  郑建翔  张颖  石磊  牟凤英
作者单位:1.“油气藏地质及开发工程”国家重点实验室·西南石油大学,四川成都610500; 2. 中国石油川庆钻探工程有限公司井下作业公司,四川成都610051;3. 中国石油塔里木油田公司质量检测中心,新疆库尔勒841000
基金项目:国家自然科学基金(51574198);国家教育部博士点基金(20135121110005)
摘    要:针对尾管固井送入钻柱动态受力和变形开展了系统地研究,主要目的是评价送入钻柱的安全性问题。首先, 根据送入钻柱的组合结构尺寸和井身结构尺寸,建立了钻柱承受摩阻力的力学模型,推导出了尾管固井过程中,由注 入流体流动引起的钻柱摩阻力和变形计算的解析数学模型;其次,根据钻柱的组合结构尺寸、钻柱内多密度和变体积 流体性质,推导出了尾管固井过程中多密度流体位置在钻柱内随注入时间变化的解析数学模型。模型已在四川龙岗 Lg63 井得到了应用,并验证了其可靠性和适用性。研究结果表明,在送入管柱内多密度流体作用下,建立的数学模型 可以实时计算出避开送入钻柱发生交变载荷作用的排量参数,并能优化出送入尾管柱安全工作的最优工作参数,为尾 管固井过程中钻柱动态摩阻力与变形引起的安全性评价提供了可靠的手段和方法。

关 键 词:尾管固井  送入钻柱  摩阻力  变形  数学模型  

Research of Dynamic Frictional Drag and Deformation of Running Drill#br# String in Liner Cementing
LIAN Zhanghua;ZHENG Jianxiang;ZHANG Ying;SHI Lei;MU Fengying.Research of Dynamic Frictional Drag and Deformation of Running Drill#br# String in Liner Cementing[J].Journal of Southwest Petroleum University(Seience & Technology Edition),2016,38(4):149-156.
Authors:LIAN Zhanghua;ZHENG Jianxiang;ZHANG Ying;SHI Lei;MU Fengying
Institution:1. State Key Laboratory of Oil & Gas Reservoir Geology and Exploitation,Southwest Petroleum University,Chengdu,Sichuan 610500,China; 2. Downhole Operation Company,Chuanqing Drilling Engineering Company Ltd.,CNPC,Chengdu,Sichuan 610051,China; 3. Quality Inspection Center,Tarim Oilfield,CNPC,Korla,Xinjiang 841000,China
Abstract:This paper systematically studies the dynamic frictional drag and deformation of running drill string in liner cementing. The objective of the research is to evaluate the safety of the running drill string in liner cementing. At first,according to the structure size of drill string assembly and wellbore configuration size,the mechanical model of drill string under the fluid frictional drag was constructed,and the analytical mathematical model of the frictional drag and deformation of drill string caused by the flow of injected fluid in liner cementing was derived. And then,based on the structure size of drill string assembly and the fluid property of multi-densities and variable volume fluids in drill string,the analytical mathematical model of the depth of multi-densities fluid varying with the injecting time was deduced. Based on these mathematical models,the software, which evaluates the safety of the running drill string in liner cementing,was applied to well LG63 in Sichuan,and proved to be reliable and applicable. The research results indicate that under the action of the multi-densities fluid in the running drill string, the mathematical models and the software can find out the pumping fluid rate when the alternate load occurs in the running drill string,and optimize the parameters of safe operation of the running drill string. It provides a reliable means and approach for the safety evaluation of running drill string caused by the dynamic frictional drag and deformation string in liner cementing.
Keywords:liner cementing  running drill string  frictional drag  deformation  mathematical model  
本文献已被 CNKI 等数据库收录!
点击此处可从《西南石油大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《西南石油大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号