首页 | 本学科首页   官方微博 | 高级检索  
     检索      

PPP项目提前终止下社会资本机会主义行为研究
引用本文:牛耘诗,褚晓凌,王守清,高雨萌.PPP项目提前终止下社会资本机会主义行为研究[J].系统工程理论与实践,2019,39(11):2784-2791.
作者姓名:牛耘诗  褚晓凌  王守清  高雨萌
作者单位:1. 清华大学 建设管理系, 北京 100084;2. 清华大学 恒隆房地产研究中心, 北京 100084;3. 中国国际工程咨询有限公司, 北京 100048;4. 中国进出口银行, 北京 100031
基金项目:国家自然科学基金(71572089,71772098)
摘    要:Public-private partnership (PPP)项目提前终止时易发生社会资本的机会主义行为,很有必要研究提前终止过程中社会资本机会主义行为的产生机理与应对措施,以保护政府和公众利益.本文根据公私双方在PPP项目中的关系,构建了政府与社会资本的博弈模型,并在前景理论的假设下,对存在终止预期的公私双方不完全信息静态博弈进行了分析.研究结果发现有限理性使得社会资本在博弈中会从混合策略偏离到纯策略;在不同的终止预期情况下,对偏离造成的影响不同.

关 键 词:政府和社会资本合作(PPP)  提前终止  机会主义行为  前景理论  博弈模型  
收稿时间:2018-04-18

Analysis of opportunistic behaviors of the private partner facing early termination in PPP projects
NIU Yunshi,CHU Xiaoling,WANG Shouqing,GAO Yumeng.Analysis of opportunistic behaviors of the private partner facing early termination in PPP projects[J].Systems Engineering —Theory & Practice,2019,39(11):2784-2791.
Authors:NIU Yunshi  CHU Xiaoling  WANG Shouqing  GAO Yumeng
Institution:1. Department of Construction Management, Tsinghua University, Beijing 100084, China;2. Hang Lung Center for Real Estate, Tsinghua University, Beijing 100084, China;3. China International Engineering Consulting Corporation, Beijing 100048, China;4. The Export-Import Bank of China, Beijing 100031, China
Abstract:Opportunistic behavior of private partner occurred frequently when PPP (public-private partnership) projects terminate early, therefore, it is necessary to study the mechanism and countermeasures of opportunistic behavior of the private partner during early termination to protect the interests of government and public. According to the relationship between the public and private partners, a game theory model is built. Under the hypothesis of the prospect theory, the private partner's Nash equilibrium in the static games of in complete information is analyzed, proving that limited rationality makes the private partner's deviate from mixed-strategy equilibrium to pure-strategy equilibrium. And different expectations of termination compensation can affect the choice of the private.
Keywords:public-private partnership  early termination  opportunistic behavior  prospect theory  game theory  
本文献已被 CNKI 等数据库收录!
点击此处可从《系统工程理论与实践》浏览原始摘要信息
点击此处可从《系统工程理论与实践》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号