Key technology and innovation of Sutong Bridge |
| |
Authors: | Zhang Xiongwen |
| |
Affiliation: | (Jiangsu Provincial Sutong Bridge Construction Commanding Department, Nanjing 210006, China) |
| |
Abstract: | Sutong Bridge is the first cable stayed bridge with the span exceeds 1 000 m which located in the mouth of Yangtze River. Its pylon foundation located in the river where the water is deep and current speed is high, and adopted the bored group piles foundation which is the largest group piles foundation. To the group piles foundation with the construction condition of deep water and high speed current, the exactly construction of the steel cofferdam which provided dry condition for the pile caps construction is a problem. This paper discussed the lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdam from 6 respects such as selection of lowering scheme, design, fabrication, lowering techniques, synchronousness controlling and orientation. In which, the design combined the coping of bored piles construction platform with bottom of steel cofferdam, the lowering as a whole techniques, synchronousness controlling and orientation technology are innovation. |
| |
Keywords: | Sutong Bridge key technology innovation structure system foundation pylon stay cables steel girder |
本文献已被 CNKI 万方数据 等数据库收录! |
| 点击此处可从《中国工程科学》浏览原始摘要信息 |
|
点击此处可从《中国工程科学》下载全文 |
|