首页 | 本学科首页   官方微博 | 高级检索  
     检索      

复合管焊接接头整管段应力腐蚀试验方法研究
引用本文:曾德智,李祚龙,李发根,吴泽,闫静.复合管焊接接头整管段应力腐蚀试验方法研究[J].西南石油大学学报(自然科学版),2021,43(4):129-137.
作者姓名:曾德智  李祚龙  李发根  吴泽  闫静
作者单位:1. 油气藏地质及开发工程国家重点实验室·西南石油大学, 四川 成都 610500;2. 中国石油石油管工程技术研究院, 陕西 西安 710077;3. 西安向阳航天材料股份有限公司, 陕西 西安 710065;4. 中国石油西南油气田公司天然气研究院, 四川 成都 610213
基金项目:国家自然科学基金(51774249);四川省科技计划资助(21JCQN0066)
摘    要:西南某高酸性气田拟采用双金属复合管作为内腐蚀控制手段,为了评估复合管焊接接头的耐腐蚀性能,根据其结构特点,建立整管段试件有限元力学模型,并通过加载应力应变测试试验验证了有限元模型的准确性,确定出焊缝合理的应力槽形式和试验总压。采用自主研制的双金属复合管整管段的腐蚀评价装置和方法,开展了X52/825冶金复合管焊接接头在苛刻应力状态和腐蚀工况下的耐蚀性能评价,结果表明,X52/825冶金复合管焊接接头在模拟工况下,经720 h腐蚀实验后,均未出现破裂或刺漏,100%射线探伤检验结果显示X52/825冶金复合管焊接接头无开裂性裂纹,具有良好的耐蚀性能。研究结果为酸性气田复合管的性能评估和安全使用提供了技术借鉴。

关 键 词:高酸性气田  双金属复合管  焊接接头  整管段  应力腐蚀开裂  
收稿时间:2021-04-30

A Study on Stress Corrosion Test Method for Welded Joint of Whole Pipe Section of Composite Pipe
ZENG Dezhi,LI Zuolong,LI Fagen,WU Ze,YAN Jing.A Study on Stress Corrosion Test Method for Welded Joint of Whole Pipe Section of Composite Pipe[J].Journal of Southwest Petroleum University(Seience & Technology Edition),2021,43(4):129-137.
Authors:ZENG Dezhi  LI Zuolong  LI Fagen  WU Ze  YAN Jing
Institution:1. State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University, Chengdu, Sichuan 610500, China;2. CNPC Tubular Goods Research Institute, Xi'an, Shaanxi 710077, China;3. Xi'an Sunward Aeromat Co. Ltd., Xi'an, Shaanxi 710065, China;4. Research Institute of Natural Gas Technology, PetroChina Southwest Oil and Gas Field Company, Chengdu, Sichuan 610213, China
Abstract:A southwest high acid gas field planed to use bimetallic composite pipes as internal corrosion control means. In order to evaluate the corrosion resistance of welded joints of composite pipes, a finite element mechanical model of the whole pipe section was established according to its structural characteristics. The accuracy of the finite element model was verified by loading stress-strain test, and the reasonable form of stress groove and total test pressure of welds were determined. Finally, the corrosion resistance evaluation of welded joint of X52/825 metallurgical composite pipe under severe stress and corrosion conditions was carried out by independently developed corrosion evaluation device and method for the whole pipe section of bimetallic composite pipe. The results show that the welded joint of X52/825 metallurgical composite pipe is not cracked or punctured after 720 hours corrosion test under stimulated working conditions. The results of 100% X-ray flaw detection show that the welded joints of X52/825 metallurgical composite pipes have no cracks, showing its good corrosion resistance. The results of this research provide theory and reference for the performance evaluation and safety use of composite pipes in acid gas fields.
Keywords:high acid gas field  bimetal clad pipe  welded joint  whole pipe section  stress corrosion cracking  
本文献已被 CNKI 等数据库收录!
点击此处可从《西南石油大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《西南石油大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号