首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于联合视角的项目支付问题及其模拟退火启发式算法
引用本文:任世科,何正文,徐渝.基于联合视角的项目支付问题及其模拟退火启发式算法[J].系统工程,2012(6):82-89.
作者姓名:任世科  何正文  徐渝
作者单位:西安交通大学管理学院
基金项目:国家自然科学基金资助项目(70971105);陕西省自然科学基金资助项目(2009JM9001);中央高校基本科研业务费专项
摘    要:从合同双方的联合视角出发,研究项目支付进度问题。其中,支付与项目事件相联系,任务是合理地安排支付事件、活动执行模式及事件发生时间,以使合同双方的共同收益最大化并使二者都能接受相应的安排。在对问题进行界定的基础上,构建由两个子模型构成的优化模型。针对问题的强NP-hard属性,设计包含两个子模块的模拟退火启发式算法,并在随机生成的标准算例集合上对算法进行测试,结果表明,该算法是求解问题的有效算法。最后,用一个算例对研究进行说明,得到如下结论:如果合同双方均按自身偏好进行决策,那么将会导致一种双输的结果;如果他们能够相互合作和协调,那么都可从项目中获得更高的收益。本文的研究可以为合同双方关于项目支付进度安排的谈判提供决策支持。

关 键 词:项目支付进度  联合视角  优化模型  模拟退火启发式算法

Joint Perspective Based Project Payment Scheduling Problem and Its Simulated Annealing Heuristic Algorithm
REN Shi-ke,HE Zheng-wen,XU Yu.Joint Perspective Based Project Payment Scheduling Problem and Its Simulated Annealing Heuristic Algorithm[J].Systems Engineering,2012(6):82-89.
Authors:REN Shi-ke  HE Zheng-wen  XU Yu
Institution:(School of Management,Xi’an Jiaotong University,Xi’an 710049,China)
Abstract:This paper involves the project payment scheduling problem from a joint perspective of two parties of contract.In this problem,payments are attached to events and the task is to arrange payment events,performing mode of activities,and occurrence time of events reasonably so as to maximize the joint revenue of the two parties and make them willing to accept the relative arrangement in the meantime.On the basis of the identification of the problem,the optimization model composed of two submodels is constructed.In view of the strong NP-hardness of the problem,a simulated annealing heuristic algorithm which consists of two modules is developed.The algorithm is tested on a data set of standard instances generated randomly and the result shows that it is an efficient algorithm for the problem studied.Ultimately,an example is utilized to illustrate the significance of the study and the following conclusion is drawn: If the two parties of contract make decisions according to their own preference,they will get an outcome which is bad for both parties.However,if they take a cooperative attitude and coordinate with each other,they will obtain more profits from the project.The research in this paper can provide decision supports for the two parties of contract in the negotiation on project payment scheduling.
Keywords:Project Payment Scheduling  Joint Perspective  Optimization Model  Simulated Annealing Heuristic Algorithm
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号