太中银铁路行车转线接触网过渡工程施工方案
引用本文:郭忠宽. 太中银铁路行车转线接触网过渡工程施工方案[J]. 科技咨询导报, 2014, 0(9): 77-78
作者姓名:郭忠宽
作者单位:中铁十五局集团电气化工程有限公司,上海松江201600
摘    要:随着我国高速铁路建设的发展,在铁路的建设过程中,存在着大量的新建铁路施工和既有线路并列同时运行的情况,为不影响既有线路的正常运营,便促成了大量的接触网过渡工程要实施.文章就太中银铁路电气化过渡工程特殊性,过渡方法及总体的过渡施工方案做了详细的阐述.

关 键 词:接触网  铁路电气化  既有线路  过渡方案

The construction program of transition OCS for the train route line of Tai ZhongYing
Abstract:with the development of Chinese high--speed railway construction, in the process of the railway construction, there will be a lot of situation such as the new railway construction project in accompany with the existing railway lane, in avoid of affecting the normal operation mode of the existing railway lane, so many OCS transition projects should be implemented. The text has done a detailed research based on the particularity of railway electrification, transition method and the general transition construction program for Tai ZhongYing Railway.
Keywords:Overhead Contact Line System (OCS)   Railway Electrification   Existing Railway Lane and Transition Construction Program