首页 | 本学科首页   官方微博 | 高级检索  
     


Closure technique for the hybrid girder cable stayed bridge of Edong Bridge
Authors:Liu Minghu  Tan Hao  Xu Guoping  Zhao Canhui
Affiliation:CCCC Highway Planning and Design Consultants Co. Ltd., Beijing 100010, China;CCCC Highway Planning and Design Consultants Co. Ltd., Beijing 100010, China;CCCC Highway Planning and Design Consultants Co. Ltd., Beijing 100010, China;Civil Engineering Institute, Southwest Jiaotong University, Chengdu 610031, China
Abstract:Based on Edong Yangtze River Bridge, which is the second longest hybrid girder cable stayed bridge with 926 m long main span, the influencing factors and crucial techniques of the main span closure method for long span hybrid girder cable stayed bridge are studied. After theoretical analysis, numerical evaluation and practical test, the loading assistant closure method is employed in Edong Yangtze River Bridge. The loading assistant closure method, with better thermal adaptability and less influence on bridge line and the forced status, can meet the requirements of the unstressed state control method. Based on the mentioned advantages, the loading assistant closure method is applicable to long span hybrid girder cable stayed bridges. The conclusion can provide a reference for the further design of the similar bridges.
Keywords:Edong Bridge  hybrid girder cable stayed bridge  closure technique  loading assistant closure method   unstressed state control method
本文献已被 CNKI 等数据库收录!
点击此处可从《中国工程科学》浏览原始摘要信息
点击此处可从《中国工程科学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号