高速铁路接触网整体吊弦预配误差分析
引用本文:刘道良. 高速铁路接触网整体吊弦预配误差分析[J]. 中国西部科技, 2013, 0(5): 17-18
作者姓名:刘道良
作者单位:中国铁建电气化局集团有限公司,北京100043
摘    要:为保证安装后的接触线高度符合设计要求,需在接触网施工过程的各个环节严格控制整体吊弦的预配精度,为此,从整体吊弦预配计算中接触悬挂的建模方法、接触网术语的界定、测量和预制过程四方面分析了造成吊弦预配误差的成因,并提出了解决措施。

关 键 词:接触悬挂  整体吊弦  预配误差

The Pre-distribution Error of Contact Wire Integral Droppers in the Construction of High-speed Railway
LIU Dao-liang. The Pre-distribution Error of Contact Wire Integral Droppers in the Construction of High-speed Railway[J]. Science and Technology of West China, 2013, 0(5): 17-18
Authors:LIU Dao-liang
Affiliation:LIU Dao-liang
Abstract:In order to ensure the standard height of contact wire, the integral droppers's pre-assigned accuracy must be strictly controlled during the whole procedures of construction process of OCS( Overall Contact system). This article discussed four causes of dropper pre-distribution error and provided corresponding solutions in these aspects including modeling method of OCS in overall dropper pre-distribution calculation, accurate definition of OCS terminology, calculation process control and prefabrication process control.
Keywords:Contact suspension  Integral droppers  Pre-distribution error