首页 | 本学科首页   官方微博 | 高级检索  
     检索      

石龟山大桥主梁施工技术要点分析
引用本文:杨建民.石龟山大桥主梁施工技术要点分析[J].湖南城市学院学报(自然科学版),1999(1).
作者姓名:杨建民
作者单位:湖南城建高等专科学校城市建设系!益阳,413000
摘    要:根据石龟山大桥预应力混凝土连续梁施工中采用的悬臂拼装法和移动模架逐孔浇筑施工法的实践,研讨了这两种方法在连续梁中施工时的工程实效及特点.从而进一步论证了施工方法选择的重要性。

关 键 词:连续梁  悬拼施工  移模逐孔浇筑施工  技术要点  工程分析

Analysis on the Essentials of Girder Construction Technique in Shigui Mountain Bridge
Yan Jianming.Analysis on the Essentials of Girder Construction Technique in Shigui Mountain Bridge[J].Journal of Hunan City University:Natural Science,1999(1).
Authors:Yan Jianming
Institution:Hunan Urban Construction College 413000
Abstract:This essay, according to the practices of cantilevering assemblage method and moving model shelf cast construction method, which are adopted in the constructions of Shigui Mountain Bridge's pre-stressed concrete continuous beam, discusses the real constructional effects and characteristics of these two methods when the are used in continuous beam constructions, and thus farther proves the importance of choosing the construction method.
Keywords:continuous beam  cantilevering assemblage construction  moving model shelf cost construction  technical essentials  engineering analysis  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号