首页 | 本学科首页   官方微博 | 高级检索  
     

无粘结预应力初沉池的施工
引用本文:马翠芬. 无粘结预应力初沉池的施工[J]. 潍坊学院学报, 2006, 6(2): 95-98
作者姓名:马翠芬
作者单位:潍坊学院,山东,潍坊,261061
摘    要:本文结合工程实例,介绍了后张无粘结预应力混凝土结构的施工工艺及施工特点。着重介绍了混凝土模板的设计与施工、预应力筋铺设定位、混凝土施工、张拉过程中应注意的问题。

关 键 词:无粘结预应力  施工技术  张拉工艺
文章编号:1671-4288(2006)02-0095-04
收稿时间:2006-01-13
修稿时间:2006-01-13

Construction of the primary sedimentation tank of the unbounded prestressed concrete
MA Cui-fen. Construction of the primary sedimentation tank of the unbounded prestressed concrete[J]. Journal of Weifang University, 2006, 6(2): 95-98
Authors:MA Cui-fen
Affiliation:Weifang University,Wefang 261061,China
Abstract:In this article,with the engineering practice,The construction technology and practical work in construction of post-tensioned unbounded prestressed concrete structure are introduced.emphasize some problems need attention existed in Discuss construction technique of form concrete structure,processes of paving and locating prestressed tendon,concrete construction and reinforcement tension.
Keywords:unbounded prestressed concrete  construction technology  tension techniqu
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号