首页 | 本学科首页   官方微博 | 高级检索  
     


Stress and noises box girders in sutong bridge
Authors:xuetao
Affiliation:[1]College of Civil Engineering, Hohai University,Nanfing 210098, China; [2]Jiangsu Province Sutong Bridge Construction Commanding Department, Nantong, Jiangsu 226009, China
Abstract:Sutong Bridge is a cable-stayed bridge with a main span of 1088 m. 370 high-precision stress monitoring measured date shows that in the process of hoisting the steel box girders, the stress of the main girders is in the fluctuant and complex state and many meteorological factors, such as sunshine radiation, temperature and wind, have important implication on the variable stress of the steel box girders. According to the real-time weather date, the stress date after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method, thereby basically eliminating the influence of meteorological factors on the stress of main girders, so that accurate and reliable stress date can be got for steel box girders adjusting and cable-tensioned construction control.
Keywords:Sutong Bridge   cable-stayed bridge   steel box girder   wavelet denoising   meteorological factor   construction control   Layered Separation method
本文献已被 维普 等数据库收录!
点击此处可从《中国工程科学》浏览原始摘要信息
点击此处可从《中国工程科学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号