虚工序的实用画法
引用本文:靳 祁,乞建勋,刘鸿雁.虚工序的实用画法[J].系统工程理论与实践,1998,18(12):35-39.
作者姓名:靳 祁  乞建勋  刘鸿雁
作者单位:华北电力大学
摘    要:研究虚工序的实用画法。本文给出了在绘图时虚工序的程序化的简洁画法,然后又给出了目前人们还没研究的网络调整时的虚工序的实用画法。并进一步给出了“多者先提原则”和“冗余原则”,使之能够大多数情况下不但实用而且能够最优。

关 键 词:虚工序  实用画法  CPM网络

The Practical Method of Drawing a Dummy Activity
Jin Qi\ Qi Jianxun\ Liu Hongyan.The Practical Method of Drawing a Dummy Activity[J].Systems Engineering —Theory & Practice,1998,18(12):35-39.
Authors:Jin Qi\ Qi Jianxun\ Liu Hongyan
Abstract:This article deals with the practical method instead of the optimal method of drawing a dummy activity.First,the article illustrated the simplest programmed drawing method of a dummy activity.Second,it discussed the practical drawing method,which had not been mentioned worldwide yet,of a dummy activity when adjusting the network chart.Furthermore,it put forward the idea of "the most,the first principle",and the "redundency principle",which,in most cases,are not only practical but also optimal.
Keywords:dummy activity  practical drawing method  CPM network