最优资金流施工进度计划的风险分析
引用本文:朱南海,李素红,孙锡衡. 最优资金流施工进度计划的风险分析[J]. 系统工程学报, 1999, 14(1): 35-42
作者姓名:朱南海  李素红  孙锡衡
作者单位:天津大学建筑工程学院,天津300072
摘    要:本文以合成事件技术为基础,研究进度计划中非关键路径对于关键路的时间干扰问题,定义了安全使用时差的新概念,以便对松驰时间和资金最佳运用情况作出可靠的风险决策。

关 键 词:关键路径法 施工进度计划 资金流 风险分析

RISK ANALYSIS OF CONSTRUCTION SCHEDULE WITH OPTIMUM CASH FLOW
Zhu Nanhai,Li Suhong,Sun Xiheng. RISK ANALYSIS OF CONSTRUCTION SCHEDULE WITH OPTIMUM CASH FLOW[J]. Journal of Systems Engineering, 1999, 14(1): 35-42
Authors:Zhu Nanhai  Li Suhong  Sun Xiheng
Abstract:This paper adopts merge event technique to study the time interference upon the critical path made by the non critical path.Definition of safe use float provides reliable risk decision making on the use of slack time and seek of optimum cash flow.The given example shows that the developed risk oriented PRC (PERT/Risk/Cost)network provides an effective and practical means for planning the construction schedule with optimum cash flow.
Keywords:critical path method(CPM)  construction schedule  cash flow  slack time  program evaluation and review technique(PERT)