冷却塔湿陷性地基处理方案比较
引用本文:刘伟,张庆华.冷却塔湿陷性地基处理方案比较[J].山东师范大学学报(自然科学版),2001,16(3):272-274.
作者姓名:刘伟  张庆华
作者单位:山东电力工程电力咨询院,
摘    要:结合章丘电厂冷却塔湿陷性地基地质资料,对强夯、灰土挤密桩处理方案进行了技术、经济对比,给出了一些测试和计算结果,分析了两种方案各自的优、缺点.

关 键 词:地基处理  强夯法  灰土挤密桩  承载力

TREATING PLAN OF COLLAPSIBLE FOUNDATION OF COOLING TOWER
Liu Wei,Zhang Qinghua.TREATING PLAN OF COLLAPSIBLE FOUNDATION OF COOLING TOWER[J].Journal of Shandong Normal University(Natural Science),2001,16(3):272-274.
Authors:Liu Wei  Zhang Qinghua
Abstract:By analyzing of the geologic data of collapsible foundation of cooling tower of Zhangqiu Power Plant,dynamic compaction and lime soil compaction piles method is compared from the technology and economy view point to treat the collapsible foundation.some test and calculational result is given, and the advantages and disacvantages of two treatment plans are analyzed.
Keywords:foundation treatment  dynamic compaction  lime  soil compaction piles  bearing capacity