葛洲坝隔河岩联合调峰长期优化调度
引用本文:温权,张士军,张勇传.葛洲坝隔河岩联合调峰长期优化调度[J].华中科技大学学报(自然科学版),1999,27(2):8.
作者姓名:温权  张士军  张勇传
作者单位:华中理工大学电力系
摘    要:首次在对水电站群进行长期优化调度时考虑水电站群的总调峰要求,结合水电站群长期优化调度数学模型提出联合调峰的方案,并以葛洲坝和隔河岩两水电站为研究对象,进行了优化计算分析

关 键 词:优化调度  联合调峰  负荷分配
修稿时间:1998-03-02.

The Combined Adjusting and Optimal Dispatch of Gezhouba and Geheyan Power Plants
Wen Quan,Zhang Shijun,Zhang Yongchuan.The Combined Adjusting and Optimal Dispatch of Gezhouba and Geheyan Power Plants[J].JOURNAL OF HUAZHONG UNIVERSITY OF SCIENCE AND TECHNOLOGY.NATURE SCIENCE,1999,27(2):8.
Authors:Wen Quan  Zhang Shijun  Zhang Yongchuan
Institution:Wen Quan Zhang Shijun Zhang Yongchuan
Abstract:The total adjusting peak demand is considered when the multireservoir long term optimal dispatching is studied. The dilemma between adjusting peak and water loss can be avoided. It is confirmed that the above theory is proper, when applied to Gezhouba and Geheyan water power plants.
Keywords:optimal dispatch  combined adjusting peak  lad dispatch