首页 | 本学科首页   官方微博 | 高级检索  
     检索      

简述四川双马水泥集团石灰石矿900mm新线工程变形监测方法与意义
引用本文:杨含忠.简述四川双马水泥集团石灰石矿900mm新线工程变形监测方法与意义[J].成都理工大学学报(自然科学版),2000(Z1).
作者姓名:杨含忠
作者单位:四川九零九建设工程有限公司!四川江油621701
摘    要:本文以四川双马水泥集团的变形监测实践工作为基础 ,系统阐述了变形监测的方法、原理、技术、技巧以及工作开展的详细步骤、具体措施

关 键 词:简述  变形  监测  方法  意义

THE METHOD AND SIGNIFICANCE OF DISTORTION MONITOR FOR 900 mm NEW-LINE OF LIMESTONE DEPOSIT, SHUANGMA CEMENT CORPORATION,SICHUAN
YANG Han-zhong.THE METHOD AND SIGNIFICANCE OF DISTORTION MONITOR FOR 900 mm NEW-LINE OF LIMESTONE DEPOSIT, SHUANGMA CEMENT CORPORATION,SICHUAN[J].Journal of Chengdu University of Technology: Sci & Technol Ed,2000(Z1).
Authors:YANG Han-zhong
Abstract:Base on the observation of the distortion monitor on the 900 mm new-line project in the SICHUAN SHUANGMA CEMENT CORPORATION,this paper demonstrated the method, the principle, the technique, the detailed process and the concrete measure of the observation systematically.
Keywords:introduction  distortion  monitor  method  significance
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号