首页 | 本学科首页   官方微博 | 高级检索  
     

对受横向载荷(力和扭矩T)的螺栓组联接预紧力计算方法的探讨
引用本文:姜贵尧. 对受横向载荷(力和扭矩T)的螺栓组联接预紧力计算方法的探讨[J]. 吉林工学院学报, 1986, 0(1)
作者姓名:姜贵尧
作者单位:吉林工学院机械工程系
摘    要:本文对受横向载荷(R和T)的螺栓组联接预紧力的计算提出了新方法。 它是在三点假设的基础上,根据被联接件间的摩擦力矩和工作力矩的平衡条件计算预紧力的。 用这种方法计算出来的预紧力较常规方法小得多,因此,不仅使联接可靠,而且可节省材料,减轻重量,降低成本。

关 键 词:预紧力  螺栓组联接  横向载荷  工作力矩  联接

Study on the Method of Calculation aboat Pretightening Force of Bolted Connections Exerted on with Lateral Lodas (Force R and Moment of Torsion T)
Jiang Guiyao The Mechanical Engineering Department. Study on the Method of Calculation aboat Pretightening Force of Bolted Connections Exerted on with Lateral Lodas (Force R and Moment of Torsion T)[J]. Journal of Jilin Institute of Technology, 1986, 0(1)
Authors:Jiang Guiyao The Mechanical Engineering Department
Affiliation:Jiang Guiyao The Mechanical Engineering Department
Abstract:This paper suggests a new method about calculating pretightening force of bolted connections exerted on with lateral loads (R and T).Based on the three hypotheses, pretightening force was eomputed according to the balance condition of frictional moment and load moment between the connected parts.The pretightenig force turned out by this method is much less than that by conventional one. and makes the connection not only reliable but also possible to save materials, lighten weight and reduc ecost.
Keywords:pretightening force  bolted connections  lateral loach load moment  connect
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号