首页 | 本学科首页   官方微博 | 高级检索  
     

Project Scheduling Using Hybrid Genetic Algorithm with Fuzzy Logic Controller in SCM Environment
引用本文:MitsuoGen KwanWooKim GenjiYamazaki. Project Scheduling Using Hybrid Genetic Algorithm with Fuzzy Logic Controller in SCM Environment[J]. 清华大学学报, 2003, 8(1): 19-29
作者姓名:MitsuoGen KwanWooKim GenjiYamazaki
作者单位:[1]GraduateSchoolofInformation,Production&Systems,WasedaUniversity,Kitakyushu808-0135,Japan [2]DepartmentofIntelligentSyStems,TokyoMetropolitanInstituteofTechnology,Hino-eity,Tokyo190-0065,Japan
摘    要:In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We develop a hybrid genetic algorithm (hGA) with a fuzzy logic controller (FLC) to solve the rcPSP which is the well known NP-hard problem. This new approach is based on the design of genetic operators with FLC through initializing the serial method which is superior for a large rcPSP scale. For solving these rcPSP problems, we first demonstrate that our hGA with FLC (flc-hGA) yields better results than several heuristic procedures presented in the literature. We have revealed a fact that flc-hGA has the evolutionary behaviors of average fitness better than hGA without FLC.

关 键 词:计划编制 混合遗传算法 模糊逻辑控制 供给链管理环境 rcPSP模型 规划方法

Project Scheduling Using Hybrid Genetic Algorithm with Fuzzy Logic Controller in SCM Environment
Mitsuo Gen,KwanWoo Kim,Genji Yamazaki. Project Scheduling Using Hybrid Genetic Algorithm with Fuzzy Logic Controller in SCM Environment[J]. Tsinghua Science and Technology, 2003, 8(1): 19-29
Authors:Mitsuo Gen  KwanWoo Kim  Genji Yamazaki
Abstract:In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We develop a hybrid genetic algorithm (hGA) with a fuzzy logic controller (FLC) to solve the rcPSP which is the well known NP-hard problem. This new approach is based on the design of genetic operators with FLC through initializing the serial method which is superior for a large rcPSP scale. For solving these rcPSP problems, we first demonstrate that our hGA with FLC (flc-hGA) yields better results than several heuristic procedures presented in the literature. We have revealed a fact that flc-hGA has the evolutionary behaviors of average fitness better than hGA without FLC.
Keywords:resource-constrained project scheduling problem (rcPSP)  priority rule method (PRM)  hybrid genetic algorithm (hGA)  fuzzy logic controller (FLC)