型钢混凝土柱的施工质量控制
引用本文:关伯卿,高立.型钢混凝土柱的施工质量控制[J].华北科技学院学报,2006,3(3):48-55.
作者姓名:关伯卿  高立
作者单位:1. 北京市双圆工程咨询监理有限公司,北京,海淀,100085
2. 华北科技学院,北京,东燕郊,101601
摘    要:以工程实例简述型钢混凝土柱的施工工艺及质量控制措施,并运用基本的质量控制方法对质量问题进行要因分析,对相关质量控制工作进行系统全面的总结.在论述型钢柱的加工工艺过程和现场安装工艺过程中重点强调了工艺流程和过程质量的控制措施,并对变形纠偏提出了处理办法,运用公式给出了必要的证明.在钢柱的安装过程中特别强调了首节柱的安装工艺及钢柱吊装的校正措施.质量控制方法选用PDCA四阶段工作循环的管理程序和方法,以最基本的方式反应出实际施工中的质量控制情况.从现场施工的角度对劲性柱的选用形式等问题提出了自己的建议.

关 键 词:型钢混凝土柱  质量控制点  要因分析
文章编号:1672-7169(2006)03-0048-08
收稿时间:2006-07-26
修稿时间:2006年7月26日

Construction Quality Control Of Steel Reinforced Concrete Column
GUAN Bo-qing,GAO Li.Construction Quality Control Of Steel Reinforced Concrete Column[J].Journal of North China Institute of Science and Technology,2006,3(3):48-55.
Authors:GUAN Bo-qing  GAO Li
Abstract:The main idea of this article is based on the instances of real project, it describe the technology and the quality control of construction , it also use some basic methods of quality control to analyse the main reason of the quality question and make a systematic summary from the work of quality control. The focal point in the part of the article to describe the course of steel reinforced concrete column how to process and install is the technology and the methods of quality control and also raise the method to handle the warping. The focal point of the part to describe the course of how to install steel reinforced concrete column is the installing technology and corrected methods of the first installing unit. The method of quality control use the four stags manage procedure , the abbreviation is PDCAo It can reflect the real basic condition of the quality control in fact. In the end of article, author raise some advances from the angle of construction to argue how to select the form of steel reinforced concrete column.
Keywords:Steel reinforced concrete column  The focal point of quality control  The analysis of the main reason