Researches on the key technology and equipment for rapid construction of long tunnels with large section
作者姓名:Gao Juru  Luo Jianchun  Tu Wenxuan
作者单位:China Railway Southwest Research Institute Co.,Ltd.,Chengdu 610031,China 
摘    要:Excavation and lining are two main and important tasks in tunnel construction. Conventional sequential operations may not be appropriate due to time limit for a project and the high cost of construction. The authors developed the new mode of tunnel construction that excavation and lining can be operated simultaneously. The new mode of tunnel construction was applied in Dahuofang Water Conveyance Project in Liaoning Province successfully. This paper makes a comparison of Main Beam TBMs and Double Shield TBMs, the type selection of TBM used in Dahuofang Water Conveyance Project, and the features of Full-ring Inner-through Lining Shutter Jumbo which solves the problem of interference between excavation and lining.

关 键 词:tunneling    TBM    Full-ring  Inner-through  Lining  Shutter  Jumbo    teamwork

Researches on the key technology and equipment for rapid construction of long tunnels with large section
Gao Juru,Luo Jianchun,Tu Wenxuan.Researches on the key technology and equipment for rapid construction of long tunnels with large section[J].Engineering Sciences,2010,8(1):40-43.
Authors:Gao Juru  Luo Jianchun  Tu Wenxuan
Institution:(China Railway Southwest Research Institute Co., Ltd., Chengdu 610031, China)
Abstract:Excavation and lining are two main important tasks in tunnel construction. Conventional sequential operations may not be appropriate due to time limit for a project and the high cost of construction. The authors developed a new mode of tunnel construction that excavation and lining can be operated simultaneously. The new mode of tunnel construction has been successfully applied to Dahuofang Water Conveyance Project in Liaoning Province. This paper makes a comparison of Main Beam TBMs and Double Shield TBMs used in Dahuofang Water Conveyance Project, and the features of Full ring Inner through Lining Shutter Jumbo which solves the problem of interference between excavation and lining.
Keywords:tunneling  TBM  Full ring Inner through Lining Shutter Jumbo  teamwork