首页 | 本学科首页   官方微博 | 高级检索  
     

Allocation of power generating and shipping of Hanjiang upstream cascade
引用本文:LIU Junping1* and CHANG Mingqi 2,3(1. School of Civil Engineering and Architecture,Zhejiang University of Technology,Hangzhou 310014,China, 2. Institute of Water Resources & Hydroelectric Engineering,Xi''''an University of Technology,Xi''''an 710048,China, 3. Shanxi Institute of Water Resources,Taiyuan 030001,China). Allocation of power generating and shipping of Hanjiang upstream cascade[J]. 自然科学进展(英文版), 2005, 15(8). DOI: 10.1080/10020070512331342840
作者姓名:LIU Junping1* and CHANG Mingqi 2  3(1. School of Civil Engineering and Architecture  Zhejiang University of Technology  Hangzhou 310014  China   2. Institute of Water Resources & Hydroelectric Engineering  Xi''''an University of Technology  Xi''''an 710048  China   3. Shanxi Institute of Water Resources  Taiyuan 030001  China)
作者单位:1. School of Civil Engineering and Architecture,Zhejiang University of Technology,Hangzhou 310014,China; 2. Institute of Water Resources & Hydroelectric Engineering,Xi'an University of Technology,Xi'an 710048,China; 3. Shanxi Institute of Water Resources,Taiyuan 030001,China
基金项目:SupportedbyNationalNaturalScienceFoundationofChina(GrantNo.50079021)
摘    要:1Generalsituationofthecascades1.1Cascadeshydropowerplants HanjiangRiverisoneofthelongesttributariesof YangtseRiver,originatingfromNingqiangcountyof ShaanxiprovinceandflowingthroughShaanxi provinceandHubeiprovince.HanjiangRiveris1567kmlongintotal,and709kmofitinShaanXi provincerunsthroughHanzhongandAnkangregions fromtheeasttothewest.TheupperreachesofHanjiangfromYangxian countytoBaihecountyinShaanxiprovinceis443km long,anditstotalheadfallsisabout280mhigh.Withabundantwaterpowerresources,its…


Allocation of power generating and shipping of Hanjiang upstream cascade
Liu Junping,CHANG Mingqi. Allocation of power generating and shipping of Hanjiang upstream cascade[J]. Progress in Natural Science, 2005, 15(8). DOI: 10.1080/10020070512331342840
Authors:Liu Junping  CHANG Mingqi
Abstract:The optimal model and simulating model of the Hanjiang cascade reservoirs operation with one day as its calculating period are established to coordinate the contradictions between power generating and shipping. The optimal model is solved by progressive optimality algorithm method adopting the theory of large system decomposing and coordinating. By analyzing the water allocation results obtained from six schemes, which are two cascades, four cascades and seven cascades joint operation considering shipping or not, the contradiction degree between power generating and shipping is investigated and some joint operation schemes are proposed.
Keywords:cascade   power generating   contradiction   shipping   optimal operation.
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号