首页 | 本学科首页   官方微博 | 高级检索  
     检索      

坪上应急引水工程季庄加压泵站厂房地基处理方案
引用本文:霍晓娟.坪上应急引水工程季庄加压泵站厂房地基处理方案[J].科技情报开发与经济,2008,18(29):214-215.
作者姓名:霍晓娟
作者单位:山西省水利水电勘测设计研究院,山西太原,030024
摘    要:介绍了灰土挤密桩在坪上应急引水工程季庄加压泵站厂房地基处理中的应用,基于实践效果,指出在严重湿陷场地采用灰土挤密桩,可有效消除湿陷性地基并提高地基的承载力。

关 键 词:地基处理  灰土挤密桩  地基承载力  湿陷性

Discussion on the Workshop Foundation Treatment Scheme of Jizhuang Pumping Station of Pingshang Emergency Diversion Project
HUO Xiao-juan.Discussion on the Workshop Foundation Treatment Scheme of Jizhuang Pumping Station of Pingshang Emergency Diversion Project[J].Sci-Tech Information Development & Economy,2008,18(29):214-215.
Authors:HUO Xiao-juan
Institution:HUO Xiao-juan
Abstract:This paper introduces the appplicaiton of lime-soil compaction pile in the workshop foundation treatment of Jizhuang Pumping Station of Pingshang Emergency Diversion Project, and based on the practical experiences, points out that using lime-soil compaction pile in serious collapse site can eliminate effectively the callapisble foundation and improve the bearing capacity of foundation.
Keywords:foundation trement  lime-soil compaction pile  foundation' s bearing capacity  collapsibility
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号