首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大型项目中的支付调度问题
引用本文:崔媛,李国辉.大型项目中的支付调度问题[J].高等职业教育,2008,17(5):68-71.
作者姓名:崔媛  李国辉
作者单位:天津职业大学,天津300410
摘    要:在大规模复杂的项目投资和调度方面,对如何在满足项目的预定目标下使净现值达到最大的问题,首先引入AoA网络并建立一个具有线性约束和非凹目标函数的支付调度问题的数学模型;然后证明问题可以变换为等价的线性规划问题;最后给出了模型的有效求解方法和经济上的解释,并附以一个具体的例子。

关 键 词:支付调度  净现值  线性规划

A Study on the Problems of Payment Scheduling in Large-Scale Projects
CUI Yuan,LI Guo-hui.A Study on the Problems of Payment Scheduling in Large-Scale Projects[J].Higher Vocational Education:Journal of Tianjin Professional College,2008,17(5):68-71.
Authors:CUI Yuan  LI Guo-hui
Institution:(Tianjin Vocational Institute, Tianjin 300410, China)
Abstract:Discussion on the investment and scheduling of large scale complex project is the focus of this paper. In this respect, how to maxmize the NPV when satisfying the schedule aim based on the construction of logistics project is being discussed. AoA is firstly introduced and a mathematic model of payment scheduling problem which is a nonlinear program with linear constraint and nonconcave objective function is established. Then, the question that the program can be transformed into a linear program equal in value is proved. In the end, an effective method to solve the model and the explanation in economy are proposed with a specific example.
Keywords:payment scheduling  NPV  linear program
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号