首页 | 本学科首页   官方微博 | 高级检索  
     

土石坝透水地基的渗流控制方法
引用本文:侯治,贾玉爱. 土石坝透水地基的渗流控制方法[J]. 太原理工大学学报, 2003, 34(3): 361-363
作者姓名:侯治  贾玉爱
作者单位:水利部,山西水利水电勘测设计研究院,山西,太原,030024
摘    要:阐述了土石坝透水地基的渗流控制方法,具体措施有:设置截水槽;浇筑混凝土防渗墙或设灌浆帷幕;铺筑上游水平防渗铺盖。实践证明效果显著。

关 键 词:土石坝 透水地基 渗流控制 截水槽 混凝土防渗墙 灌浆帷幕 防渗铺盖
文章编号:1007-9432(2003)03-0361-03
修稿时间:2002-09-27

Control Method for Seepage Flow of Earth-rock Dam with Pervious Foundation
HOU Zhi,JIA Yu ai. Control Method for Seepage Flow of Earth-rock Dam with Pervious Foundation[J]. Journal of Taiyuan University of Technology, 2003, 34(3): 361-363
Authors:HOU Zhi  JIA Yu ai
Abstract:Control methods for seepage flow of earth rock dam with pervious foundation are expounded,which include:setting up cutoff trench;pouring concrete impervious core or grout curtain;establishing upstream impervious blanket. It has been proved by practice that these three methods make significant effects in control of seepage flow of earth rock dam with pervious foundation.
Keywords:control of seepage flow  earth rock dam  control method  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号