首页 | 本学科首页   官方微博 | 高级检索  
     检索      

风电项目总承包商风险的模糊综合评价
引用本文:胡萍,刘潋.风电项目总承包商风险的模糊综合评价[J].科技情报开发与经济,2010,20(13):137-139.
作者姓名:胡萍  刘潋
作者单位:三峡大学水利与环境学院,湖北宜昌,443002
摘    要:通过分析总承包商面临的风险因素,建立了风险评价指标体系,在模糊综合评价模型的基础上对其风险进行量化评价,以期对总承包商的风险能作出客观、全面、合理的综合评价。

关 键 词:风电项目  总承包商  风险因素  模糊综合评价

Fuzzy Comprehensive Evaluation on General Contractor Risks of Wind Power Project
HU Ping,LIU Lian.Fuzzy Comprehensive Evaluation on General Contractor Risks of Wind Power Project[J].Sci-Tech Information Development & Economy,2010,20(13):137-139.
Authors:HU Ping  LIU Lian
Institution:HU Ping,LIU Lian
Abstract:This paper analyses some risk factors faced by the general contractor,sets up a risk evaluation index system,and makes quantitative evaluation on the risks based on the fuzzy comprehensive evaluation model for working out an objective,comprehensive and rational evaluation on the risks of the general contractor.
Keywords:wind power project  general contractors  risk factor  fuzzy comprehensive evaluation
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号