Construction and control technology of the main bridge superstructure of Sutong Bridge |
| |
Authors: | Zhang Hong Luo Chenbin Zhang Yongtao You Xinpeng |
| |
Affiliation: | 1.Huazhong University of Science and Technology;Wuhan 430074;China;2.CCCC-Second Harbour Engineering Company Limited;Wuhan 430014;China |
| |
Abstract: | The Sutong Yangtze River Bridge(short as Sutong Bridge)is now the largest span cable-stayed bridge in the world.The construction of the superstructure of the middle bridge covered several stages including erection of the big block girders for the side span,assistant span and tower area,erection of standard girders and closure of the middle span.The big block girders were hoisted by a floating crane,and the standard girders were hoisted by a double crane system on the deck.The pushing assistant method was ad... |
| |
Keywords: | Sutong Bridge superstructure construction method construction control geometry control wind-resistant measure |
本文献已被 CNKI 维普 万方数据 等数据库收录! |
| 点击此处可从《中国工程科学》浏览原始摘要信息 |
|
点击此处可从《中国工程科学》下载全文 |