首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Construction Process Control of Large Extra Caissons
Authors:Shaowei Hu   ÿ  Hongxia Wang   ê  Jiansheng Fan  ª໺
Institution:HU Shaowei,**,WANG Hongxia 2,FAN Jiansheng 1. Department of Materials and Structural Engineering,Nanjing Hydraulic Research Institute,Nanjing 210024,China, 2. School of Naval Architecture and Ocean Engineering,Shanghai Jiao Tong University,Shanghai 200030,China, 3. Department of Civil Engineering,Tsinghua University,Beijing 100084,China
Abstract:The complexity of geotechnical engineering and variability in construction circumstances of large extra caissons make the problem of maintaining appropriate sink attitude quite difficult, especially in keeping sink uniformity and achieving the expected final sink depth. A new construction control method is presented using H theory, considering uncertainties in the mechanics model and external noise in the construction site parameters. The design method of an H controller has consequently been obtained for large extra caissons. Control results using only constructor experiences are compared with simulation results using the H controller for a practical engineering situation, which indicates that the H controller is successful in maintaining sink uniformity, avoiding sink as well as in achieving the expected final sink depth.
Keywords:large extra caissons  construction process  attitude control  H control
本文献已被 CNKI 维普 万方数据 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号