基于AHP的公路工程施工定额测定现场筛选指标体系
引用本文:王首绪,袁新杰.基于AHP的公路工程施工定额测定现场筛选指标体系[J].长沙理工大学学报(自然科学版),2012,9(3):15-18.
作者姓名:王首绪  袁新杰
作者单位:长沙理工大学交通运输工程学院,湖南长沙,410004
基金项目:交通部西部行业攻关课题
摘    要:公路工程施工定额测定现场的选择必须综合考虑人工、设备、材料、管理和施工环境5个方面19个因素的影响.在运用AHP法确定各指标权重的基础上,建立了施工定额测定现场筛选指标体系.实例计算结果表明筛选效果良好.

关 键 词:施工定额测定现场  层次分析法  指标体系

Selection index system of measured scene of highway engineering construction quota based on AHP
WANG Shou-xv,YUAN Xin-jie.Selection index system of measured scene of highway engineering construction quota based on AHP[J].Journal of Changsha University of Science and Technology:Natural Science,2012,9(3):15-18.
Authors:WANG Shou-xv  YUAN Xin-jie
Institution:(School of Traffic and Transportation Engineering,Changsha University of Science and Technology,Changsha 410004,China)
Abstract:The selection of construction quota determination scene must consider artificial,equipment,materials,management and construction environment in 5 aspects of the effects of 19 factors.Applying AHP method to determine the weight of each index value,this paper establishes construction quota determination scene screening index system.The index system provides the basis for company screening the quota determination scenes.
Keywords:construction quota determination scene  analytic hierarchy process  index system